Bikeability Level 1 for Trainees 7+

Aylesbury - Thu 01 Sep
    HCT is running these the courses on behalf of AVDC. Bookings can be made directly through them online...

 

Consultations

Aylesbury became a national cycle town back in 2005.  Since then the Cycle Aylesbury team have consulted on numerous schemes which have been implemented across the town.  Today there are 9 dedicated cycle paths which make up the Gemstone Cycle Network.  Each route is named after a gemstone and branded signs display the colour of the gemstone and how long it takes to get from the origin to the destination - in minutes.

Below is a list of the cycle schemes which the team have consulted on over the years.  Please note, this list contains only the schemes that were made available on line at the time of the consultation.  Click on the title to view the scheme information and drawings.

Sapphire Way cycle path link along Cambridge Street, Aylesbury - June 2010

Proposed new Topaz Way cycle path, Hawkslade – Town Centre - Part 1 - December 2009

Proposed new Topaz Way cycle path, Hawkslade – Town Centre - Part 2 -  December 2009

Proposed extension of the Emerald Way cycle path, Fairford Leys to Haydon Hill - Part 1 - November 2009 

Proposed extension of the Emerald Way cycle path, Fairford Leys to Haydon Hill - Part 2 - November 2009

Proposed zebra crossing on Camborne Avenue, Amber Way Aylesbury - Septemeber 2009

Proposed new footpath layout on Dunsham Lane, Aqua Way Aylesbury - September 2009

Proposed Raised Crossing on Leach Road, Pebble Way Aylesbury - September 2009

Proposed extension of Jet Way cycle route - Part 1 - September 2009

Proposed extension of Jet Way cycle route - Part 2 - September 2009

Proposed extension of Jet Way cycle route - Part 3 - September 2009

Any future consulation information and scheme drawings will be posted here.